About This Project
SDA were awarded the EPC contract to supply The Tooheys Brewery with a trigeneration plant
Main features:
- Electrical output of 2000kW at 11kV
- Exhaust converted into 700kw steam
- HT engine loop converted into 750kW chilled water
- LT engine loop designed and installed to provide future domestic hot water
- Grid parallel, ability to black start and run in island mode.