SDA Engineering was the turnkey contractor chosen to design, supply, install and maintain a 3.1MW gas-fired cogeneration at the RMIT city campus in Melbourne. Though SDA have experience with rooftop installations in crowded areas, such as 530 Collins St Melbourne and Adelaide Uni, this project presented...

SDA designed, supplied, installed and commissioned this system, which includes a 2MW gas fired generator with heat recovery to hot water and an exhaust driven boiler to produce steam. The plant has been in service since 2014, and SDA has been assisting with service and...

SDA were awarded the EPC contract to supply The Tooheys Brewery with a trigeneration plant Main features: Electrical output of 2000kW at 11kV Exhaust converted into 700kw steam HT engine loop converted into 750kW chilled water LT engine loop designed and installed to provide future domestic...

Located in Port Melbourne, Symex is a world-competitive manufacturer exporting over 75 per cent of its products to over 35 countries, including the Asia-Pacific region, North America and Europe . With a site history beginning in 1856, Symex is renowned for its consistently high-quality products...

This co-generation system consists of a 7.9MW gas fired turbine producing electricity for the site’s 22kV distribution system, coupled to an exhaust heat boiler producing high pressure steam to the site. The generator can seamlessly transition the whole site into island operation during a grid...

The RMIT Bundoora tri-generation system produces electrical energy, heat and chilled water. The core of the plant is a 1.2MW gas fired generator with heat recovery system for hot water production. The hot water can also be used to power an absorption chiller to produce...

SDA installed a gas fired co-generation plant at the new RAH, which produces up to 4MW of electricity and 4MW of heat for the building’s hot water system. Our installation included 2 x 2MW generators packaged inside acoustic enclosures, a heat recovery system for each...

SDA was appointed as the Build Own and Operate contractor for the Midfield Meats International cogeneration project under a 15 year contract to supply heat and power to the Warrnambool works in Victoria. Main features: The power plant consisted of a MWM TCG 2020V16 gas generator...

We managed to get this one finished 8 weeks ahead of schedule, in time to supply power to the grid for the national peak. The core of the plant is a 4.4MW gas turbine which supplies power to the brewery and exports to the grid,...